Old Man River Dam - Flood Repair
       
     
Old Man River Dam - Flood Repair

Client: Alberta Transportation

Consultant: Klohn Crippen Berger

Start Date: October 2014

Completion Date: November 2014

Project Scope: 

  • Salvage, sort and size creek bed material deposited at the bottom of the dam’s spillway

  • Excavate, haul and place granular material in seepage collection pond areas

  • Sizing and placement of salvaged riprap for bank protection

  • Supply and install 3 stand pipe piezometers