Camrose Regional Landfill Cell 22
       
     
2.JPG
       
     
6.JPG
       
     
1.JPG
       
     
3.JPG
       
     
4.JPG
       
     
5.JPG
       
     
Camrose Regional Landfill Cell 22
       
     
Camrose Regional Landfill Cell 22

Client: City of Camrose

Consultant: WSP

Start Date: August 2020

Completion Date: October 2020

Project Scope:

  • Excavate, haul and stockpile ~11,000 m³ of topsoil and subsoil

  • Excavate, haul and stockpile ~20,000 m³ common material

  • Import and place ~5,000 m³ clay material from borrow

  • Install ~20,000 m³ compacted clay liner and clay liner end slopes including subgrade preparation

  • Supply and place perforated and non-perforated HDPE leachate collection pipe including geotextile and drainage rock

  • Supply and install leachate collection manholes and associated fittings

  • Load, haul and place ~14,000 m² of tire shred drainage layer

  • Load, haul and place approximately 1 meter thick garbage frost cover layer

  • Supply and install 7 each 500 mm CSP drainage culverts

  • Install a recycled concrete equipment access road including approaches

  • Installed recycled concrete burn pits