Exshaw Creek Debris-Flood Mitigation Project
       
     
Flood Mitigation Project
       
     
Flood mitigation project
       
     
Earthworks
       
     
Excavation
       
     
Excavator and truck at work
       
     
Flood mitigation project
       
     
Excavator at work
       
     
Excavator at flood mitigation project
       
     
Flood mitigation project
       
     
Excavator lifting
       
     
Excavation at flood mitigation project
       
     
Flood mitigation project
       
     
Flood mitigation project
       
     
Flood mitigation installation
       
     
Flood mitigation work
       
     
Flood Mitigation Project
       
     
Workers at flood mitigation project
       
     
Foot bridge installation
       
     
Flood mitigation
       
     
Worker hard at work
       
     
Pedestrian bridge installation
       
     
River flood mitigation
       
     
Flood mitigation project
       
     
Exshaw Creek Debris-Flood Mitigation Project
       
     
Exshaw Creek Debris-Flood Mitigation Project

Client: MD of Bighorn No. 8

Consultant: Golder Associates

Start Date: April 2019

Completion Date: July 2020

Project Scope:

  • Load, haul and place ~160,000 m³ of creek bed materials

  • Import, load, haul and place ~60,000 tonne of various sized rock riprap armour

  • Screening, sorting and sizing, of various granular materials onsite from the creek excavation and placement of screened product as a drainage bedding for the rock riprap armour

  • Salvage, load, haul and placement of ~5000 m³ of various sized rock riprap armour

  • Supply and install ~5300 m² of articulated concrete block mattresses including supply and placement of granular bedding material and non-woven geotextile

  • Installation of ~650 percussion driven earth anchors (PDEAs)

  • Supply and install a debris retention structure with 15 ea H-Piles embedded in 8 meters of concrete including an Alberta Transportation approved bridge coating system

  • Proposed, designed and built an alternate custom fabricated ~40 meter length clear span steel truss pedestrian bridge, including cast in place abutments

  • Supply and install Hi-Load board insulation under the creek bed to protect existing utilities

  • Supply and place ~33,000 m² of topsoil, subsoil and hydroseed

  • Supply and place ~500 lineal meters of class II/III rock barriers

Flood Mitigation Project
       
     
Flood Mitigation Project
Flood mitigation project
       
     
Flood mitigation project
Earthworks
       
     
Earthworks
Excavation
       
     
Excavation
Excavator and truck at work
       
     
Excavator and truck at work
Flood mitigation project
       
     
Flood mitigation project
Excavator at work
       
     
Excavator at work
Excavator at flood mitigation project
       
     
Excavator at flood mitigation project
Flood mitigation project
       
     
Flood mitigation project
Excavator lifting
       
     
Excavator lifting
Excavation at flood mitigation project
       
     
Excavation at flood mitigation project
Flood mitigation project
       
     
Flood mitigation project
Flood mitigation project
       
     
Flood mitigation project
Flood mitigation installation
       
     
Flood mitigation installation
Flood mitigation work
       
     
Flood mitigation work
Flood Mitigation Project
       
     
Flood Mitigation Project
Workers at flood mitigation project
       
     
Workers at flood mitigation project
Foot bridge installation
       
     
Foot bridge installation
Flood mitigation
       
     
Flood mitigation
Worker hard at work
       
     
Worker hard at work
Pedestrian bridge installation
       
     
Pedestrian bridge installation
River flood mitigation
       
     
River flood mitigation
Flood mitigation project
       
     
Flood mitigation project