Kananaskis River Wave Build
       
     
excavator placing riprap
       
     
excavator at river build
       
     
river construction build
       
     
Kananaskis river
       
     
Kananaskis River build
       
     
excavator at river build
       
     
excavator placing riprap
       
     
riprap placement
       
     
river build project
       
     
excavator placing riprap
       
     
Kananaskis River Wave Build
       
     
Kananaskis River Wave Build

Client: Alberta River Surfing Association

Start Date: April 2019

Completion Date: May 2019

Project Scope:

  • Supplying, delivering, stockpiling, loading, hauling and placement of various sized riprap

  • Loading, hauling and placement of select flat, square and oversized riprap for fine tuning wave and viewing platform of various sized riprap

  • Remove ~75 concrete blocks from the river channel and dispose offsite

  • Select non-natural debris removal and disposal from river channel

  • River isolation installation and removal

  • Daily coordination with TransAlta for river flow volume control

  • Daily set-up and tear-down of isolations measures

  • QAES monitoring and reporting for in-stream work

excavator placing riprap
       
     
excavator placing riprap
excavator at river build
       
     
excavator at river build
river construction build
       
     
river construction build
Kananaskis river
       
     
Kananaskis river
Kananaskis River build
       
     
Kananaskis River build
excavator at river build
       
     
excavator at river build
excavator placing riprap
       
     
excavator placing riprap
riprap placement
       
     
riprap placement
river build project
       
     
river build project
excavator placing riprap
       
     
excavator placing riprap