Kananaskis Region - River Bank Reconstruction     Client:  Alberta Environmental and Parks c/o RC3 Ventures Inc.    Consultant:  McElhanney Consulting Services Ltd.    Start Date:  March 2016   Completion Date:  November 2016   Project Sc
       
     
20160329_155655.jpg
       
     
3.JPG
       
     
20160413_130532.jpg
       
     
2.JPG
       
     
20160422_181412.jpg
       
     
20160425_092332.jpg
       
     
20160501_092941.jpg
       
     
20160501_093206.jpg
       
     
20160503_163400.jpg
       
     
20160503_164412.jpg
       
     
20160504_174056.jpg
       
     
20160506_102607.jpg
       
     
5.jpg
       
     
4.jpg
       
     
       
     
8.jpg
       
     
6.JPG
       
     
7.jpg
       
     
9.jpg
       
     
10.jpg
       
     
11.jpg
       
     
12.jpg
       
     
  Kananaskis Region - River Bank Reconstruction     Client:  Alberta Environmental and Parks c/o RC3 Ventures Inc.    Consultant:  McElhanney Consulting Services Ltd.    Start Date:  March 2016   Completion Date:  November 2016   Project Sc
       
     

Kananaskis Region - River Bank Reconstruction

Client: Alberta Environmental and Parks c/o RC3 Ventures Inc. 

Consultant: McElhanney Consulting Services Ltd. 

Start Date: March 2016

Completion Date: November 2016

Project Scope:

Part One:
Flood Repair and Mitigation on Kananaskis River

  • Restoration of critical flood plain areas along Kananaskis river by re-aligning existing river bank to suit pre-flood conditions

  • Partial lowering of Kananaskis River bed by selective scalping of gravel bars

  • Debris exclusion by construction debris control dikes at select locations

  • River bank protection at vulnerable river reaches, including riprap

  • Construction of environmental enhancement features, such as vegetation on river banks and root wads in river channel

  • Reclamation of construction areas



Flood Repairs and Flood Mitigation on Evan Thomas Creek

  • Restoration of pre-flood channel locations

  • Lowering of creek bed level to original design level

  • Provision of large containment dikes on both sides of the design channel alignment

  • Bank protection along both left and right bank containment dikes

  • Widening of flood way channel at downstream end

  • Construction of environmental enhancements features, such as access for wildlife over riprap bank protection works, root wads in active creek channel

  • Riparian vegetation at select locations within and alongside floodway and reclamation of construction areas


Part Two:
Evan Thomas Creek Crossing – Water and Wastewater Relocation

  • Shutdown isolation and temporary servicing for water and sanitary lines

  • Realignment of approximately 100 lm of 500 mm HDPE waterline including removal and disposal of existing main, and supply and install new main

  • Realignment of approximately 80 lm of 100 mm HDPE sanitary forcemain, including removal and disposal of existing forcemain, and supply and install new forcemain

  • Testing, startup and cleanup of new water main and sanitary forcemain

20160329_155655.jpg
       
     
3.JPG
       
     
20160413_130532.jpg
       
     
2.JPG
       
     
20160422_181412.jpg
       
     
20160425_092332.jpg
       
     
20160501_092941.jpg
       
     
20160501_093206.jpg
       
     
20160503_163400.jpg
       
     
20160503_164412.jpg
       
     
20160504_174056.jpg
       
     
20160506_102607.jpg
       
     
5.jpg
       
     
4.jpg
       
     
       
     
8.jpg
       
     
6.JPG
       
     
7.jpg
       
     
9.jpg
       
     
10.jpg
       
     
11.jpg
       
     
12.jpg